This is our new we just bought on 5 acres of land. It's going to be a ton of work, but we'll have fun doing it. The pace will be slow, but we will get there!

Monday, November 12, 2012

Mid-November updates

I recently got an assistant for work (FINALLY), so I've tried to make use of my slow work days which only lasted about a week. At least I'm working normal full-time hours now and not 60 hour work weeks. Justin has been working long hours too so our progress had become non-existant.  I got a few small tasks done that had been bugging me: patch a couple areas of sheetrock, paint places we never got a 2nd coat on, etc.

We also had our driveway graded. Unless you knew which areas to avoid, you'd bottom out in a car. Rain water also kept flowing down our driveway erroding parts and leaving a pond in part of the area we parked on. We still have to get gravel (have to figure out how much we need!) but it's hasn't gotten muddy since it was packed back down.

My BIGGEST near-accomplishment has been our kitchen cabinets.  Over the past couple of months, as I've had time and motivation, I've been sanding all of our cabinets & drawers in the kitchen. They were covered in a smooth vaneer so they took a while to sand the finish off.
Then I had to take off all the doors to sand and paint the cabinet faces.
Then put all the drawers, doors and hardware back on. And my dad came over yesterday to rewire our "new" dishwasher and install it.

We still have to put the toe kicks on and finish the ends of the rows with wainscotting or something but this month's gotten busy so that will be at a later date.

No comments:

Post a Comment