This is our new we just bought on 5 acres of land. It's going to be a ton of work, but we'll have fun doing it. The pace will be slow, but we will get there!

Sunday, January 16, 2011

As of 1/15/11

I got to do a little actual demo this weekend and tear down some sheetrock. During the week, Justin and his uncle, Clay, framed up the excessively large doorways into two bedrooms.

This was our helper for Saturday, Doug, with his helpers: beer, guns and powertools.

We now have a bedroom door and over a half a wall of sheetrock. Now we just need more sheetrock!

The new toilet in the master bath.

I got all the flooring out of the kitchen and our 2nd bedroom now has a door with the oversized door frame closed in.

Sunday, January 9, 2011

As of 1/8/11

Yesterday was the first time I've been back to the house since the closing.
Replaced both missing toilets


Justin removing the random 50 or so nails sticking out of the ceiling beam.

Since there is obviously little left to demo in our house, ripping up the lineolum was the best I could do!

New doors for the bedrooms. It's just propped up for now until we frame in the rest of the gap.

In the beginning...

Front

Living room

Kitchen

Dining area

Hallway

Part of laundry room

Master bedroom

Bedroom 2

Bedroom 3

Master bath

Bathroom 2

Barn

Barn

Woods behind house

Pond