Brad works in HVAC and installed our new A/C unit.
He also installed a new coil. Now we have functioning heat and air. This helps a LOT on colder days with putty and paint drying properly.
This is Brad holding our new dog , Zeth.
Evan works as an electrician which helps ME out a lot! He moved a couple outlets and light switches for me. When we left, the guys were working on the pressure tank under our house. We FINALLY have running water BUT the pressure tank keeps tripping the circuit breaker. Solving this problem this will be their project today.
My goal for the day was to paint all the ceilings in the house (except for the kitchen/dining room since there are a few places that need to be patched). Here is the before and after. Only a SLIGHT difference. It's crazy how dingy paint can get over the years. I nearly accomplished my goal. I was in the final room (the master bath) and the handle to my roller broke! Oh well. I'll just go back to it after we've patched the other ceilng and knock it all out at once.